teralosa.blogg.se

Download the proud highway
Download the proud highway




download the proud highway

This is for public safety during the construction, duration and deconstruction of Download Festival. The L87 footpath which runs from Bosworth Road, Castle Donington to the Derbyshire County Boundary will be closed from 26th May – 16th June. If you are travelling from Castle Donington or Melbourne to the event, please note that we have introduced a shuttle bus for local residents and festival goers, please find below the timetable: We strongly discourage walking to site on foot, as there are no safe walking routes. North and East Car Park Entrance – Park Lane If you believe the noise levels are too high at your property please get in touch with our Residents Team via email Car Parks & Getting TO SiteĬampers will start arriving on Wednesday 7th June early morning, arriving into the site in either North, East or West Car Parks.

download the proud highway

Saturday 10th and Sunday 11th June: 11am – 11pm Thursday 8th and Friday 9th June: 1pm – 11pm Saturday 10th and Sunday 11th June: 10am – 11am Live Music Thursday 8th and Friday 9th June: 10am – 12pm

  • More standard campsites and the introduction of our ‘Mini Moshers’ campsite Key TimingsĬampsites: 12pm on Wednesday 7th June – 12pm on Monday 12th June 2023Ĭar Parks: 7am on Wednesday 7th June – 4pm on Monday 12th June 2023.
  • The Arena is open for an extra day on Thursday 8th June.
  • Addition of South Car Park and South Entrance for Day Ticket Holders.
  • These changes are being instigated after a review of the Download 2022 and changes to the overall site plan. Download 2023 will see several changes to the site layout.






    Download the proud highway